Attachment 1 is a block diagram of the XRM setup for the Low Energy Ring (LER). Physically, this is located underneath the right wing of Fuji Hall, tens of meters away from the crossing point of the beams (180deg around ring from interaction point). Directly upstairs is the optics hut where the readout PC is located.
Attachment 2 details the physical location of all the components around the fermionics detector.
Attachment 3 is picture of the fermionics detector area from farther back.
Attachment 4 shows (somewhat) the source of the X-Rays and the positron beam pipe from which they originate.
|